CS FundamentalsModerateTCS NQT · Infosys pattern
In the V-model, acceptance testing is planned against which development phase?
- A. Architectural design
- B. Detailed (module) design
- C. Coding
- D. Requirements analysis
Correct answer: D. Requirements analysis
Each left-side phase pairs with a right-side test level: requirements ↔ acceptance testing, system/architectural design ↔ system and integration testing, module design ↔ unit testing.
Practise more Software Engineering, Git and Cloud Basics questionsSoftware Engineering, Git and Cloud Basics: notes and key points
More Software Engineering, Git and Cloud Basics questions
- How does beta testing differ from alpha testing?
- A black-box technique divides the input domain into classes whose members the program should treat the same way, then tests one value from…
- A control flow graph has 9 edges and 7 nodes and is a single connected component. What is its cyclomatic complexity?
- A REST client wants to change only the email field of an existing user resource without sending the whole resource. Which HTTP method fits…
- A POST request successfully creates a new resource on a REST server. Which status code is the most appropriate response?
- What is the difference between git fetch and git pull?